Project Description
Hunt replaced a failing 120’ long x 40’ tall brick wall section with FRP. During demolition, it was discovered that replacement of structural beams that were rusted through would also be required. Field blasting and painting of steel was also part of this challenging project located in a hard to reach area of the operating facility.